The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
8 评论s
IT Department (官方验证)
SCormier (官方验证)
已确认 SCormier (官方验证)
Jroyer (注册用户)
Jroyer (注册用户)
SCormier (官方验证)
Jroyer (注册用户)
关闭 DPW Engineering LW (官方验证)
Railing repairs completed in 2019
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.