The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
8 Commentaires
IT Department (Membre officiel vérifié)
SCormier (Membre officiel vérifié)
Reconnu SCormier (Membre officiel vérifié)
Jroyer (Utilisateur inscrit)
Jroyer (Utilisateur inscrit)
SCormier (Membre officiel vérifié)
Jroyer (Utilisateur inscrit)
Clos DPW Engineering LW (Membre officiel vérifié)
Railing repairs completed in 2019
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.