The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
8 تعليقs
IT Department (تم التحقق رسميا)
SCormier (تم التحقق رسميا)
تم إقراره SCormier (تم التحقق رسميا)
Jroyer (مستخدم مسجل)
Jroyer (مستخدم مسجل)
SCormier (تم التحقق رسميا)
Jroyer (مستخدم مسجل)
مغلق DPW Engineering LW (تم التحقق رسميا)
Railing repairs completed in 2019
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.