The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
8 Bình luậns
IT Department (Chính thức đã xác nhận)
SCormier (Chính thức đã xác nhận)
Được thừa nhận SCormier (Chính thức đã xác nhận)
Jroyer (Người dùng đã đăng ký)
Jroyer (Người dùng đã đăng ký)
SCormier (Chính thức đã xác nhận)
Jroyer (Người dùng đã đăng ký)
Đã đóng DPW Engineering LW (Chính thức đã xác nhận)
Railing repairs completed in 2019