Deskripsyon
The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
8 Komentos
IT Department (Beripikadong Opisiyal)
SCormier (Beripikadong Opisiyal)
Kinilala SCormier (Beripikadong Opisiyal)
Jroyer (Rehistradong User)
Jroyer (Rehistradong User)
SCormier (Beripikadong Opisiyal)
Jroyer (Rehistradong User)
Isinara DPW Engineering LW (Beripikadong Opisiyal)
Railing repairs completed in 2019
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.