Beschreibung
The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
The sidewalks and concrete railings along the bridge are in rough shape. I don't know if this is a winooski/burlington issue or Vtrans, but hopefully there are some longer term plans to fix up this main route in the near future.
8 Kommentierens
IT Department (Verifizierter Beamter)
SCormier (Verifizierter Beamter)
Anerkannt SCormier (Verifizierter Beamter)
Jroyer (Registrierter Benutzer)
Jroyer (Registrierter Benutzer)
SCormier (Verifizierter Beamter)
Jroyer (Registrierter Benutzer)
Geschlossen DPW Engineering LW (Verifizierter Beamter)
Railing repairs completed in 2019
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.